More than 12 kW
Systems above the combined threshold must be regularly inspected, with no more than five years between assessments.
TM44 air-conditioning assessments
UK-wide air-conditioning inspections for commercial buildings and property portfolios—giving the person responsible a clear compliance record and practical opportunities to improve system efficiency.

The compliance test
The 12 kW threshold applies to the combined effective rated output of air-conditioning units within a building that are controlled by one person. Several smaller units can therefore bring a building into scope even when no individual unit exceeds 12 kW.
The person who controls the system is responsible for ensuring the inspection is completed and retaining the report.
Systems above the combined threshold must be regularly inspected, with no more than five years between assessments.
The assessment examines system efficiency, sizing, controls, operation and available documentation before recommendations are produced.
You receive the registered air-conditioning inspection report and clear recommendations for potential energy and operational improvement.

Real site evidence
Equipment identification, available documentation, controls and operating arrangements are reviewed on site before the assessment is completed and lodged.
Important distinction
Routine servicing, refrigerant checks and equipment safety remain separate responsibilities. TM44 focuses on the energy efficiency of the air-conditioning system, the way it is controlled and whether opportunities exist to improve performance.
Multi-site compliance
Portfolio owners often inherit incomplete records across different properties, tenants and managing agents. ECO Connect can review the estate, identify likely systems in scope and coordinate inspections through one national programme.
Arrange a portfolio reviewMap sites, system information and existing report dates.
Manage contacts, survey schedules and national delivery.
Record equipment, estimated output and building responsibility.
Track completed inspections, expiry dates and exceptions.
Our inspection process
Review site details, system types, outputs and any existing report.
Request asset lists, maintenance information and available controls documentation.
Assess the system, controls, condition indicators and operational arrangements.
Issue the registered report with practical efficiency recommendations.
Air-conditioning systems with an effective rated output above 12 kW must be inspected by an energy assessor at intervals of no more than five years.
TM44 enquiries
We will confirm the information needed to scope the inspection and provide a clear quotation.